Amata B.Grimm Power 2 Limited
 
 
Amata Power (Bangpakong) Combined Cycle Power Plant is AMATA POWER LIMITED’s second power plant in the Amata Nakorn Industrial Estate. The planned construction of this project consists of two separate phases. The first, a combined cycle power plant with a generating capacity of 114 MW, was completed and began operation in October 2001. Of the total production, 90 MW is dispatched to the Electricity Generating Authority of Thailand (EGAT) under that Small Power Producer (SPP) Program. The remaining energy is sold to industrial users in the estate.

 
Amata B.Grimm Power 2 Limited ( The second phase) - a 55 MW expansion



Project cost: 78m USD

Registered Capital: 560m Baht

Technical Information:

Co-generation Combined Cycle Power Plant
  Amata B.Grimm Power 2 Expansion Project
Plant Model CC 206 B  
Plant Capacity 114 MW 55 MW
Gas Turbine Model PG 6561 B PG 6581 B
Steam Turbine Model ATP3 - C240 Siemens
Steam Capacity 20 Ton / Hour 10 Ton / Hour


EPC Contractor::   ABB Turbienen Nurnberg GmbH
    ALSTOM Power (Thailand) Ltd.


Customer Information:
Electricity

Operation Date

Capacity
- EGAT (21-years contract)

Sep’01

90 MW

- Industrial Users Sep’01 79 MW
Total

169 MW



Financial Information:
Shareholder Structure
Amata Power Limited 70.0%
Amata B.Grimm Power Holding Limited 30.0%
Financing
 
Amount
Term
Kreditanstalt fur Wiederaufbau of Germany
31.5m USD
2007-2014
KBANK & GSB
1060m Baht
2007-2016
Mizuho & GSB
1220m Baht
2007-2014
* GSB = Goverment Savings Bank
     
 

Special Events :

The Grand Opening

On 7th March 2003, His Excellency Privy Councilor Air Vice Marshal Kamthon Sindhvananda presided over the grand opening ceremony of the Amata Power (Bangpakong) Power Plant.